So the question could be re-phrased. How much does it cost to collect SMF records, NOT ONLY SMF address space.

IMHO easily measureable is cost of storage. Onec upon a time I asked CICS guy why he consumed approx 30 gigabytes previous month and over 480 gigabytes current month. It is matter of storage (disk, tape), CPU cycles for SMF address space (almost irrelevant as ther noted), IFASMFDP (irrelevant also), and all the tasks producing the records. The only method I can imagine the cost of CPU is plain comparison of system with and without record collection. Done by application basis (i.e. we switch trace on/off and see the results).


--
Radoslaw Skorupka
Lodz, Poland

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to