Thanks to everyone that was so patient with my question. I fixed it by adding the VOLUME(xxxxx) parameter to the PROGxx LNKLST ADD and IPLing.
Mark D Pace Senior Systems Engineer Mainline Information Systems 1700 Summit Lake Drive Tallahassee, FL. 32317 Office: 850.219.5184 Fax: 888.221.9862 http://www.mainline.com ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html

