I always schedule Secondary Space Mgt. before Primary in order to free
up space on my ML1s. Perhaps you need to reduce the ML1 days either in
your SMS MGT. classes or Parmlib ML1Days parameter for non-SMS data to
accelerate data movement to ML2, if your SLAs haven't taken that
flexibility from you.

To answer your question: TSO HSEND SETSYS SECONDARYSPMGMTSTART(1245
1655) then after migration is done, reset to your normal time. 

You might consider reducing the threshold on your ML1 volumes to 50% or
less, or add more ML1s.

-----Original Message-----
From: John Dawes [mailto:[EMAIL PROTECTED] 
Sent: Thursday, August 10, 2006 10:21 AM
To: [email protected]
Subject: Re: DFHSM QUESTION

Thanks David for the tip.  I found the error which was posted earlier
and was not trapped:
  *ARC0560E MIGRATION LIMITED: NO MIGRATION LEVEL 1 SPACE  561
 ARC0560E (CONT.) AVAILABLE                                 
 ARC0559I SPACE MANAGEMENT OF SBP137 WILL NOT TARGET  562   
 ARC0559I (CONT.) MIGRATION LEVEL 1 UNTIL THE REQUESTED VOLU
 ARC0559I (CONT.) MADE AVAILABLE                            
 ARC0559I SPACE MANAGEMENT OF SBP133 WILL NOT TARGET  563   
 ARC0559I (CONT.) MIGRATION LEVEL 1 UNTIL THE REQUESTED VOLU
 ARC0559I (CONT.) MADE AVAILABLE                            
 ARC0400I VOLUME SBP137 IS 55% FREE, 00003628 FREE  564     

  The problem was resolved by itself.  However, in the future should I
need to MIGRATE LEVEL 1 to MIGRATE LEVEL 2 how do I do this?  Is there a
way to force DFHSM to perform a migrate of LEVEL 1  to LEVEL 2 out of
its scheduled time?  This would be necessary in case of an emergency.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to