Hi,

With regard to the query:

"I have a requirement in which based on the day we need to execute the step ie 
for eg if it is monday then we need to execute the sep2 or else or other 
days we need to skip this step and execute the other step/ Please any one how 
this can be coded in the jcl"

Whilst Itschak's response is valid, I would urge the use of a scheduling 
package such as OPC (TWS), Control-M, or CA-7 especially if this is a regular 
requirement.

These products were designed to address this specific requirement whereas JCL 
is NOT.

Kind regards - Terry

Terry Sambrooks
Director
KMS-IT Limited
228 Abbeydale Road South
Dore
Sheffield
S17 3LA
UK

Tel: +44 (0)114 262 0933
WEB:
www.legac-e.co.uk


Reg: England & Wales 3767263 at the above address

All outgoing E-mails are scanned but it remains the recipients responsibility 
to ensure that their system is protected from viruses, trojans, worms, and 
spy-ware.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to