>   We have a 9672 r16 with 5 lpars (four are os/390 2.10 and one is >
vse)
>   We have experienced low response time in batch (workload).
>   My  manager need to know: HOW MANY LPARS IS OPTIMUS ON ONE 9672 R16
?
>   HANK IN ADVANCE.
> 
>   Manuel Tabares S.

The rule of thumb has been a max of 3 logical processors per physical
processor.
After this, LPAR management overhead goes up very quickly. This has been
proven by
my actual experience. LPAR performance improved dramatically when the
ratio of logical to 
physical processors was reduced to 3:1 or less.

Since this is a uni-processor(? _ See Shane's post) and each LPAR must
be assigned at 
least 1 logical processor,  you currently have a 5:1 logical to
physical. This is a 
not-good situation.

BY the way, the last time I had a mixed MVS/VSE environment, the VSE
system did not
play very nicely when attempting to share physical devices. Since this
was more than
25 years ago, this may have been fixed.

HTH,

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to