I have a Serverpac order that is in the last stages of the Custompac dialog INSTALL phase. However, the last time I used the dialog, I went into option M Modify System Layout to review some values. I immediately received an error indicating that the physical volumes were over-allocated. This was odd as I was already beyond this point and all of the volumes were already populated. When I backed out, I noticed that the rest of the options were prefixed with asterisks indicating that I had not yet performed the remaining steps. I had finished using the Driver system and was on the newly IPL'ed Target system when this occurred. Somehow something got back leveled. Does anyone know what may have happened and how to get the dialog back in sync.
---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO Search the archives at http://bama.ua.edu/archives/ibm-main.html

