In our IP stack we currently have SOMAXCONN set to 1500, however, we are 
still running into problems with certain applications exceeding backlog limit 
and 
connections being dropped.  When I look at the Maximum in backlog I show 
many different numbers other than the 1500.  Last week a DB2 application 
which is showing maximum in Backlog of 50, exceeded this by 2 so those 2 
connections were dropped due to backlog exceeded.  Today we have 28 
connections dropped for our FTPD1 application.  The maximum backlog for 
FTPD1 is showing 50 as well.  Can anyone tell me where I change the 
Maximum in backlog for FTPD1 and DB2 applications? 

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to