It really depends upon the involvement of the staff at the site that I'm
installing it on.  If I do it myself, it typically takes a day or two to get
to the first IPL, and from 2 to 4 weeks to first production IPL, depending
on the mix of software that needs to be configured.  If there is also a LOT
of non-IBM software is involved, it can add about 25 to 50% to the time.  At
a site that is making a HUGE jump where I have to perform a lot of upgrades
to the "other stuff" that they are using, there is really no way to tell how
long and get it right.  Sometimes it's very quick and sometimes (when
problems arise where I might have to deal with a vendor), it can take a
while longer.

If the client helps a bit I can shave off about 5 to 10% of the time.  If
they help a lot, it normally throws the timetable into a shambles and it
takes a REALLY long time. :)

Brian

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [EMAIL PROTECTED] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to