>I'm considering moving RECYCLE from my primary host to a secondary to offload 
>some cycles from the primary. I'm running z/OS 1.8 on 3/4 LPARS in the prod 
>sysplex and 1.10 on the 4th.

We've moved other functions, such as threshold migration to non-Prod (low 
utilised) images to save Prod MSU's.

>Anyone tried this and fell in a ditch or 
were results as expected? Tips/Tricks? Any redbook,etc info in this area.

I don't know of any resources to tell you the best practices, but if the 
alternate image is on a slower box:
1. It takes longer -- maybe too long.
2. ENQ's/Locks may last too long and cause problems. Especially, if the moved 
function ends up taking to much time.

I hope this helps, and is not too vague.
But, moving any function from a primary to a secondary machine can impede 
throughput.
As always, monitor (before & after), analyse and tune (I know this sounds like 
mom & apple pie [or, in Canada: mom & maple syrup], but the obvious seems to 
require repetition).
Any hard/soft configuration change needs to be managed.

We do of course, share HSM CDS's across the sysplex.

-
Too busy driving to stop for gas!

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to