Was wondering if anyone could point me in the right direction.

Over the weekend we upgraded our last 2.2 LPAR to z/OS 2.4, so that I could IPL 
my z/OS 2.5 system.

With that it was required that I update the scheduler from 9.3 to 9.5,  
Allocated all the new files, did the upgrades, etc

And restarted the scheduler, Daily plan loaded and everything looked correct.

All my jobs were waiting on time or it looked that way.  This morning 
everything was still waiting.

The status was an * or R, but it will not submit the jobs.

I am not an expert, I dabble mostly, but can figure out most things, but this 
one has me lost.

Can someone point me in were the issue might be?

Ms Terri E Shaffer
Senior Systems Engineer,
z/OS Support:
ACIWorldwide – Telecommuter
H(412-766-2697) C(412-519-2592)
[email protected]


________________________________
 [https://go.aciworldwide.com/rs/030-ROK-804/images/aci-footer.jpg] 
<http://www.aciworldwide.com>
This email message and any attachments may contain confidential, proprietary or 
non-public information. The information is intended solely for the designated 
recipient(s). If an addressing or transmission error has misdirected this 
email, please notify the sender immediately and destroy this email. Any review, 
dissemination, use or reliance upon this information by unintended recipients 
is prohibited. Any opinions expressed in this email are those of the author 
personally.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN

Reply via email to