My forehead is bruised from beating it against the wall. I am trying to set up
a simple JOBGROUP with two simultaneous jobs. Here is my JCL (excerpted for
brevity)
//DRCPYFC JOBGROUP
//DRCPYFC1 GJOB
// CONCURRENT=DRCPYFC2
//DRCPYFC2 GJOB
// CONCURRENT=DRCPYFC1
//DRCPYFC ENDGROUP
//* -------------------------------
//DRCPYFC1 JOB (ACCT#),'DR COPY ',CLASS=A,
// MSGCLASS=X,REGION=800M
// SCHEDULE JOBGROUP=DRCPYFC
//* stuff to do
//DRCPYFC2 JOB (ACCT#),'DR COPY ',CLASS=A,
// MSGCLASS=X,REGION=800M
// SCHEDULE JOBGROUP=DRCPYFC
//* more stuff to do
Jes is rejecting this masterpiece with:
$HASP100 DRCPYFC ON INTRDR FROM TSU17899
TECHXXX
$HASP1110 DRCPYFC -- Illegal JOBGROUP card - card not
valid within JOBGROUP
$HASP1110 DRCPYFC -- Illegal JOBGROUP card - card not
valid within JOBGROUP
IRR010I USERID TECH905 IS ASSIGNED TO THIS JOB.
$HASP1111 DRCPYFC -- ENDGROUP card - JOBGROUP DRCPYFC contains errors
I tweak, I read the manual (many times). But must be missing something. It
did run once, but sequentially - not concurrently. I added CONCURRENT cards
and this is where I am.
What funny little JES syntax did I miss? I modeled this on the sample in the
book.
----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN