Go to ISPF 3.4 and see what volume SYS1,LINKLIB is on. Then go look at the SMP/E job you ran and see if SYS1.LINKLIB is listed as being on the same volume. If it is, you updated modules in the in use SYS1.LINKLIB.
You should have a complete copy of the system volume and possibly a second volume. Your SMP setup should have DDDEFs that point to this volume that is used for maintenance. Then when you are ready with the maintenance, you schedule an IPL and IPL from the new pack. That way you have the original pack to fall back on if there are problems. Thank You, Paul Strauss ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [email protected] with the message: INFO IBM-MAIN
