On Tue, Jul 12, 2016 at 11:56 PM, Edward Gould <[email protected]> wrote:
> Do you really want the operators involved in this? They have enough work to do. > Consider cancelling the job period. > > Ed > > I agree. I've become curious about the reason for this request. I am assuming that this is some sort of "production" job. In most shops, that is set up and done by a production scheduling system such as TWS or CA-7 or ???. The last time I remember the operators doing something akin to this was in the days of punched cards. -- "Pessimism is a admirable quality in an engineer. Pessimistic people check their work three times, because they're sure that something won't be right. Optimistic people check once, trust in Solis-de to keep the ship safe, then blow everyone up." "I think you're mistaking the word optimistic for inept." "They've got a similar ring to my ear." >From "Star Nomad" by Lindsay Buroker: Maranatha! <>< John McKown ---------------------------------------------------------------------- For IBM-MAIN subscribe / signoff / archive access instructions, send email to [email protected] with the message: INFO IBM-MAIN
