The final word on the zIIP thing is going to be our capacity person.  If that 
person is okay with the situation then I'm okay with it.  From where I sit I 
don't want any more overhead for zIIP management then needed.  We only have 3 
zIIP on the box.  10 of the lpars get 1 zIIP and the 11th lpar gets 2 zIIP.  
That 11th lpar is an important lpar.  Yes we have the weights set for the zIIP 
that the tech lpars are bottom on the list.

If you are suggesting that we config offline the 2nd zIIP before BOOST is done, 
my answer would I don't know what would happen.  That would be a question for 
IBM to answer.  That is why we are looking at testing BOOST=SPEED to see how 
that reacts.  That's why we all have the tech lpars in our environments to try 
things out before we roll to production.


Thanks..

Paul Feller
AGT Mainframe Technical Support


-----Original Message-----
From: IBM Mainframe Discussion List [mailto:[email protected]] On Behalf 
Of Tony Harminc
Sent: Thursday, February 06, 2020 3:42 PM
To: [email protected]
Subject: Re: z15 System Recover Boost [EXTERNAL]

On Thu, 6 Feb 2020 at 16:31, Feller, Paul <[email protected]> wrote:

> Well we have our z15 in and running.  We have been testing the System 
> Recovery Boost on our tech lpars.  What we have found makes us think 
> we will be setting the option to BOOST=SPEED for our tech lpars.  I 
> normally define each lpar with a minimum of 1 zIIP with 1 zIIP in 
> reserve.  With BOOST=SYSTEM the 2nd zIIP is getting put online and it stays 
> online for an hour.  We really don't want to do that on our tech lpars.  We 
> may also look at this related to the other lpars as we roll this out to see 
> what happens.

What's the down side to having that zIIP online to that lpar? Is some other 
work losing out because (presumably lower importance) "tech"
work is being done on the zIIP?

> Just daydreaming here, but it would be nice if there was a time limit 
> you could set for how long BOOST was active (unless I missed 
> something).  As I stated before BOOST was active for an hour on our tech 
> lpars and they really don't need that BOOST for that long.

Could you not vary it offline at the right time using existing automation?

Tony H.

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions, send email to 
[email protected] with the message: INFO IBM-MAIN

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: INFO IBM-MAIN

Reply via email to