On 3/16/06, Stephen Frazier <[EMAIL PROTECTED]> wrote: > I would suggest that you define 3 guest machines on your z/VM 5.2. Run > your VSE/ESA 2.6.3 systems in two of them and your VM/ESA 2.4 system in > the third. You will get much better performance that way than running > the VSEs third level.
This certainly makes more sense than the proposed path, but it will only work if the VSE systems have no dependency on things that run on the VM/ESA 2.4 system and expect VSE to be close. You should be able to wire through virtual CTCs for VTAM. But for example if you're currently sharing your tape units by dynamic attach/detach through Dynam/T VM, then that would be a problem (would need to migrate that to z/VM 5.2 as well). Rob -- Rob van der Heij Velocity Software, Inc