Update and heads-up: Our problem turned out to be a bad MCL update on the z890 that only affected apps doing long CCW chains. We are fortunate enough to have a backup system to move VM to while the problem was being investigated and patched. There is a lesson here about "non-disruptive" MCL changes on a live system, though.
-----Original Message----- From: The IBM z/VM Operating System [mailto:[EMAIL PROTECTED] On Behalf Of Peter Carrier Sent: Wednesday, November 05, 2008 7:49 AM To: [email protected] Subject: Re: Interface control check Ah, yes, brings to mind the infamous "Slow Bending Pins" of Memorex lore.= .. The analogy with optical channels for us at MIT involves the LHC ;) Peter
