On Fri, 1 May 2009 12:11:40 -0400, Rich Greenberg <[email protected]> wrot
e:

>Check the power needed in Kilowatts for 3ph vs 1ph.  And check with the
>power company if a 3ph kwh (killowatt hour) costs the same or more or
>less than a 1ph kwh.

The Installation and Planning manual lists maximum system power 
consumption as 4.2kW without regard to whether it is 1 phase or 3 phase. 
 
In any case, cost per kwh is not relevant since the site is charging a 

flat fee for the installed circuit, not for the amount of power drawn 
through the circuit.

There are 2 references I've found in the Installation and Planning manual
 
that 3 phase uses only 2 of the phases and the 3rd phase provides 
redundancy against a fault in one of the other 2 phases.  Three phase 
seems to be an extra layer of redundancy on top of the dual power feed 

redundancy.  Is there anything more to it than that?

Brian Nielsen

Reply via email to