Rob Siemborski wrote:
In released versions or just internally?
If in released versions, I suggest a Last Call for the SASL-IR draft right now.
Released versions in both cases. I was hoping to wait until the new SASL draft was last called, in order to deal with any last minute modifications that happened to it -- and Mark wanted to wait until
draft-siemborski-rfc1734bis draft-siemborski-rfc2554bis
were last called, which may be more controversial
Which in their turn depend on revision of the base SASL document. The latter should be finished in 1-2 months (hopefully).
Alexey
