President Director of PT Pelindo II, R.J.
Lino said the construction of the underground channel was intended to
provide access to the pilgrims going to the shrine. In line with the
construction, the pavilion, and the gate way will be moved to the south
side of the grave. This measure is taken in order not to disrupt the
entry routes into the container terminal, which is planned to be built
in accordance with international standards.




http://icaexpo.coop


      

Kirim email ke