President Director of PT Pelindo II, R.J. Lino said the construction of the underground channel was intended to provide access to the pilgrims going to the shrine. In line with the construction, the pavilion, and the gate way will be moved to the south side of the grave. This measure is taken in order not to disrupt the entry routes into the container terminal, which is planned to be built in accordance with international standards.
http://icaexpo.coop
