On 1 February 2013 14:51, Mircea Markus <[email protected]> wrote: > Hi, > > As we've discussed in Palma, the first thing we'll start with for 5.3 is > make the test suite green. Moving the CI to an own-managed machine is > tracked as well on a different thread. > We have quite some random failures[1], let's first focus on stabilising the > test suite before any other fixes (unless something critical is raised by > QA). > > Besides the test suite Sanne also required an early release of ISPN-2689 : > supporting Apache Lucene 4, so this pull request should also make its way > into the release. Galder/Sanne this seems to be ready for integration?
That's right the pull is ready, but I could wait a couple of weeks for it. The really urgent one I'm waiting for is ISPN-2435 ! (As we discussed in Palma too...) Cheers, Sanne > > I've cut a 5.2.x branch of master. Please make sure the relevant fixes would > be contributed to both master (5.3) and back ported to 5.2.x (at this stage > this shouldn't be more than cherry-picking of the commits to the other > branch). > > [1] http://goo.gl/q7EKk > > Cheers, > -- > Mircea Markus > Infinispan lead (www.infinispan.org) > > > > > > _______________________________________________ > infinispan-dev mailing list > [email protected] > https://lists.jboss.org/mailman/listinfo/infinispan-dev _______________________________________________ infinispan-dev mailing list [email protected] https://lists.jboss.org/mailman/listinfo/infinispan-dev
