So here's the deal.  I have 3 database servers and 8 fileservers (3 of which
are the database servers).

I've devided the volumes into 7 approximately even sized groupings for dumps.
I then do something like:

Sunday:  level 0 of set 1
Monday:  level 1 of set 1
Tuesday:  level 1 of set 1
Wednesday:  level 1 of set 1
Thursday: level 2 of set 1
Friday: level 2 of set 1
Saturday: level 2 of set 1


I do the same thing for all seven sets, except shifted by 1 (set 2 starts the
cycle on Monday).

The question is, what machines should be the beefy ones?  Should I upgrade
the 3 database servers, or will the fileservers be the ones getting pegged?
Or, on the other hand, will the machine running the vos dump and sending it
out to a tape drive need the most power?


--
Scott Grosch            JF1-22, Pole D18, first floor           503-264-4812

Reply via email to