[ 
https://ovirt-jira.atlassian.net/browse/OVIRT-627?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=20809#comment-20809
 ] 

eyal edri [Administrator] commented on OVIRT-627:
-------------------------------------------------

Actually replacing the existing flows which run post merge, we need to check if 
its possible to run pre-merge with Zuul the entire flow and reject patches if 
it fails.

> Implement Zuul as pre-merge action to run experimental flows 
> -------------------------------------------------------------
>
>                 Key: OVIRT-627
>                 URL: https://ovirt-jira.atlassian.net/browse/OVIRT-627
>             Project: oVirt - virtualization made easy
>          Issue Type: Bug
>            Reporter: eyal edri [Administrator]
>            Assignee: infra
>
> Today, we can test a patch per project on each of the ovirt versions using 
> experimanal flow
> i,e:
> run build_artifacts with a patch -> deploy to experimental -> run test job
> this is problematic since it actually deploys the build with the patch to the 
> experimental repo which should only contain built pkg that are merged.
> We need to either close the flow or add param to the build artifacts that 
> says 'create temp repo/test repo' so the built rpm won't be part of the 
> official tested repo and the link to latest_tested won't be updated if this 
> option is triggered.



--
This message was sent by Atlassian JIRA
(v1000.319.1#100012)
_______________________________________________
Infra mailing list
Infra@ovirt.org
http://lists.ovirt.org/mailman/listinfo/infra

Reply via email to