Hi On 11/10/23 21:22, Jakub Zelenka wrote:
- 2 alphas - think 2 are enough as each RM can try one release. - 4 betas and require that all RFC has to be merged before beta3 is released. It means we would have 2 extra betas to iron out all RFC issues and still be able to introduce ABI breaks
Should this read: "before beta 3 is tagged"? An RFC could be merged after the tag and before the release, and then there would only one remaining Beta for it.
- 4 RC - real feature freeze without any ABI or API breaks
Best regards Tim Düsterhus -- PHP Internals - PHP Runtime Development Mailing List To unsubscribe, visit: https://www.php.net/unsub.php