June,

I am sorry. That was meant to say, "If it is ok with you..."

Pat

> -----Original Message-----
> From: iotivity-dev-bounces at lists.iotivity.org [mailto:iotivity-dev-
> bounces at lists.iotivity.org] On Behalf Of Lankswert, Patrick
> Sent: Tuesday, August 04, 2015 10:34 AM
> To: Mirani, Jawid; juney at samsung.com; Keane, Erich
> Cc: iotivity-dev at lists.iotivity.org
> Subject: Re: [dev] IoTivity 0.9.2 RC3 release
> 
> June,
> 
> It is ok with you, we can publish any issues (and hopefully any workarounds) 
> that
> we find to the wiki all the way up to the plugfest.
> 
> Pat
> 
> > -----Original Message-----
> > From: Mirani, Jawid
> > Sent: Tuesday, August 04, 2015 8:49 AM
> > To: juney at samsung.com; Keane, Erich; Lankswert, Patrick
> > Cc: soonhwang.choi at samsung.com; iotivity-dev at lists.iotivity.org
> > Subject: RE: IoTivity 0.9.2 RC3 release
> >
> > June,
> >
> > We are planning to complete our testing by 8/6/2015. I will let the
> > team know if we run into any major issue/s.
> >
> > --Jawid
> >
> > -----Original Message-----
> > From: ???(June Yong Young) [mailto:juney at samsung.com]
> > Sent: Tuesday, August 04, 2015 7:03 AM
> > To: Mirani, Jawid; Keane, Erich; Lankswert, Patrick
> > Cc: soonhwang.choi at samsung.com; iotivity-dev at lists.iotivity.org
> > Subject: IoTivity 0.9.2 RC3 release
> >
> > Dear IoTivity members,
> >
> > IoTivity "0.9.2-RC3" has been tagged on 0.9.2-dev branch.
> > All QA tests should be completed by 8/6, so that RC3 version can be
> > delivered to SWG for PF#3 on 8/7.
> > I really hope this version should be final one for 0.9.2.
> >
> > Regards
> > June
> >
> >
> > June Yong Young
> > OIC Open Sourece WG Project Planning & Requirement TG Chair IoTivity
> > Release Function Lead
> >
> > Samsung Electronics Co.,Ltd.
> > Software R&D Center, IoT Solution Lab. | Web & Convergence Team
> > Principal Engineer
> >
> > T: +82-31-301-6107, M: +82-10-9530-6107 E-mail :juney at samsung.com
> >
> >
> > -----Original Message-----
> > From: Mirani, Jawid [mailto:jawid.mirani at intel.com]
> > Sent: Tuesday, August 04, 2015 11:34 AM
> > To: Keane, Erich; Lankswert, Patrick
> > Cc: soonhwang.choi at samsung.com; iotivity-dev at lists.iotivity.org;
> > juney at samsung.com
> > Subject: Re: [dev] About preparing 0.9.2 Release Schedule
> >
> > Erich,
> >
> > Thanks for the patch list. We will evaluated list first thing tomorrow
> > and let the team know how long will it take to verify the fixes and
> > run regression to ensure there are no new suprises.
> >
> >
> > ?Jawid
> >
> >
> > On 8/3/15, 8:02 PM, "Keane, Erich" <erich.keane at intel.com> wrote:
> >
> > >The Discovery/Connectivity code is all ready for 0.9.2-RC3 as far as
> > >I can tell.  This is what we have in the 0.9.2-dev branch since the RC2:
> > >
> > >--Fix for IOT-646
> > >--Fix Issue where CBOR String Arrays weren't correctly copying all
> > >values --Fix for IOT-632 --Fix for IOT-622 --Fix for IOT-627 --Fixed
> > >unprocessed timed-out messages in the stack --Fixed Server
> > >De-registration of observers --Fix
> > >OcConnectivityType/OcConnectivityFlags merge issues in Android Stack
> > >--Android Sample Apps permissions correctly set in
> > >AndroidManifest.xml
> > >
> > >
> > >
> > >On Mon, 2015-08-03 at 17:04 +0000, Lankswert, Patrick wrote:
> > >> Erich,
> > >>
> > >> It is really important that we (you) articulate the list of patches
> > >>and the issues that they resolve for Jawid. The sooner that he
> > >>validates (or
> > >>not) the sooner we can notify the community with regards to feature
> > >>stability.
> > >>
> > >> Thanks! You rock!
> > >>
> > >> Pat
> > >>
> > >> > -----Original Message-----
> > >> > From: Keane, Erich
> > >> > Sent: Monday, August 03, 2015 12:25 PM
> > >> > To: Lankswert, Patrick
> > >> > Cc: soonhwang.choi at samsung.com; iotivity-dev at lists.iotivity.org;
> > >>Mirani,
> > >> > Jawid; juney at samsung.com
> > >> > Subject: Re: RE: [dev] About preparing 0.9.2 Release Schedule
> > >> >
> > >> > I think we're all set, Ill bring it up in standup today, but I'm
> > >>pretty sure the
> > >> > Android ones that Joey/Tim pushed were all that we really needed.
> > >> >
> > >> >
> > >> > On Mon, 2015-08-03 at 16:19 +0000, Lankswert, Patrick wrote:
> > >> > > Erich,
> > >> > >
> > >> > >
> > >> > >
> > >> > > Do you have a list of fixes that you think are high priority
> > >> > > for 0.9.2? If so, get them pushed.
> > >> > >
> > >> > >
> > >> > >
> > >> > > Pat
> > >> > >
> > >> > >
> > >> > >
> > >> > > From:??? [mailto:juney at samsung.com]
> > >> > > Sent: Monday, August 03, 2015 11:30 AM
> > >> > > To: Lankswert, Patrick; ???; Keane, Erich;???
> > >> > > Cc: iotivity-dev at lists.iotivity.org; Mirani, Jawid
> > >> > > Subject: Re: RE: [dev] About preparing 0.9.2 Release Schedule
> > >> > >
> > >> > >
> > >> > >
> > >> > >
> > >> > > Pat, Jawid,
> > >> > >
> > >> > >
> > >> > >
> > >> > >
> > >> > > We have no option now anyway.
> > >> > >
> > >> > >
> > >> > > Samsung have fixed some issues that occurred on RC2, so could
> > >> > > you
> > >>fix
> > >> > > your all the issues by around 17:00 PST?
> > >> > >
> > >> > >
> > >> > > Then after that we will tag RC3 tomorrow morning(Korea time)
> > >> > >
> > >> > >
> > >> > >
> > >> > >
> > >> > >
> > >> > > Regards
> > >> > >
> > >> > >
> > >> > > June
> > >> > >
> > >> > >
> > >> > > Sent from Mobiledesk
> > >> > >
> > >> > >
> > >> > >
> > >> > >
> > >> > > ---?? ???---
> > >> > > ??? : Lankswert, Patrick/patrick.lankswert at intel.com
> > >> > > ???? : 2015/08/03 23:39 (GMT+09:00) ?? : RE: [dev] About
> > >> > > preparing 0.9.2 Release Schedule
> > >> > >
> > >> > > June,
> > >> > >
> > >> > > I do not have that information. I need to defer to Jawid.
> > >> > >
> > >> > > Pat
> > >> > >
> > >> > > > -----Original Message-----
> > >> > > > From: iotivity-dev-bounces at lists.iotivity.org
> > >>[mailto:iotivity-dev-
> > >> > > > bounces at lists.iotivity.org] On Behalf Of ???(June Yong Young)
> > >> > > > Sent: Friday, July 31, 2015 11:18 PM
> > >> > > > To: Keane, Erich; soonhwang.choi at samsung.com
> > >> > > > Cc: iotivity-dev at lists.iotivity.org; Mirani, Jawid
> > >> > > > Subject: Re: [dev] About preparing 0.9.2 Release Schedule
> > >> > > >
> > >> > > > Hi Pat, Jawid,
> > >> > > >
> > >> > > > Could you urgently let us know when Intel?s QA will complete
> > >> > > > 2nd
> > >> > > round test and
> > >> > > > when 3rd QA will be completed if it starts on 8/3 again, so
> > >> > > > that
> > >>we
> > >> > > can judge
> > >> > > > whether or not we can make a 0.9.2 release before 8/7?
> > >> > > >
> > >> > > > You know, if we cannot deliver 0.9.2 to SWG on 8/7, then PF#3
> > >> > > > will
> > >> > > be at risk.
> > >> > > >
> > >> > > > June Yong Young
> > >> > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > >>IoTivity
> > >> > > Release
> > >> > > > Function Lead
> > >> > > >
> > >> > > > Samsung Electronics Co.,Ltd.
> > >> > > > Software R&D Center, IoT Solution Lab. | Web & Convergence
> > >> > > > Team
> > >> > > Principal
> > >> > > > Engineer
> > >> > > >
> > >> > > > T: +82-31-301-6107, M: +82-10-9530-6107 E-mail
> > >> > > > :juney at samsung.com
> > >> > > >
> > >> > > > -----Original Message-----
> > >> > > > From: Keane, Erich [mailto:erich.keane at intel.com]
> > >> > > > Sent: Saturday, August 01, 2015 1:20 AM
> > >> > > > To: soonhwang.choi at samsung.com
> > >> > > > Cc: sungkyu.ko at samsung.com; woochul.shim at samsung.com;
> > >> > > > iotivity- dev at lists.iotivity.org; Mirani, Jawid;
> > >> > > > juney at samsung.com; Agrawal,
> > >> > > Sachin
> > >> > > > Subject: Re: [dev] About preparing 0.9.2 Release Schedule
> > >> > > >
> > >> > > > We have an issue in the resource model with the Android stack
> > >> > > > as
> > >> > > well that
> > >> > > > we're waiting on, plus a handful of bug-fixes that have been
> > >>pushed
> > >> > > since the
> > >> > > > RC2. I would be very much FOR an RC3.
> > >> > > >
> > >> > > > -Erich
> > >> > > >
> > >> > > >
> > >> > > > On Fri, 2015-07-31 at 08:37 +0000, SOON HWANG CHOI wrote:
> > >> > > > > Dear All
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Test result of 2nd round test for Samsung modules may be
> > >>reported
> > >> > > at
> > >> > > > > next Monday (8/3) because consent of 2nd roud test was delayed.
> > >> > > > >
> > >> > > > > Currently we found below major defects. so we think RC3
> > >> > > > > should
> > >>be
> > >> > > > > released for 0.9.2 Official release.
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > 1. PPM Tizen sample app is not working if Invoke button is
> > >>pushed
> > >> > > > >
> > >> > > > > 2. PPM Android sample app is not working if "START PLUGIN"
> > >>button
> > >> > > is
> > >> > > > > pushed
> > >> > > > >
> > >> > > > > 3. RM's build error in linux 64ibt environment
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Thanks
> > >> > > > >
> > >> > > > > Soonhwang Choi
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > ------- Original Message -------
> > >> > > > >
> > >> > > > > Sender : ???<juney at samsung.com> S6(??)/??/IoT Solution
> > >> > > Lab(S/W
> > >> > > > > ??)/????
> > >> > > > >
> > >> > > > > Date : 2015-07-31 09:51 (GMT+09:00)
> > >> > > > >
> > >> > > > > Title : About preparing 0.9.2 Release Schedule
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Hi Pat, George, Jawid,
> > >> > > > >
> > >> > > > > When will Intel?s QA complete 2nd round test?
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Hi Pat, Jawid, SoonHwang,
> > >> > > > >
> > >> > > > > Could you let us know the 2nd round test result by 7/31, so
> > >> > > > > that
> > >> > > we
> > >> > > > > can find out whether or not we need RC3?
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > 0.9.2 : ?Spec vA Compliant + Spec vB Partial?
> > >> > > > >
> > >> > > > > ? Type for Release : Minor release, Schedule Driven,
> > >> > > > > PlugFest
> > >> > > > > #3
> > >> > > > >
> > >> > > > > ? Schedule (5 weeks ahead of QA completion) (cf. Original
> > >> > > > > QA
> > >> > > request
> > >> > > > > is 6 weeks ahead of QA start)
> > >> > > > >
> > >> > > > > ? 6/22, API freeze & Programmer?s guide freeze
> > >> > > > >
> > >> > > > > ? 7/20, Feature complete & Review Complete and make ?0.9.2-
> > RC1?
> > >> > > > > release to QA
> > >> > > > >
> > >> > > > > ? 7/24, QA 1st round complete
> > >> > > > >
> > >> > > > > ? 7/27->7/28, 0.9.2-RC2 release to QA
> > >> > > > >
> > >> > > > > ? 7/31, QA 2nd round complete
> > >> > > > >
> > >> > > > > ? 8/03, Website Open (if no issue)
> > >> > > > >
> > >> > > > > ? 8/17 week, Plug Fest #3
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > June Yong Young
> > >> > > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > >> > > > >
> > >> > > > > IoTivity Release Function Lead
> > >> > > > >
> > >> > > > >
> > >> > > > > Samsung Electronics Co.,Ltd.
> > >> > > > >
> > >> > > > > Software R&D Center, IoT Solution Lab. | Web & Convergence
> > >> > > > > Team
> > >> > > > >
> > >> > > > > Principal Engineer
> > >> > > > >
> > >> > > > > T: +82-31-301-6107, M: +82-10-9530-6107
> > >> > > > >
> > >> > > > > E-mail :juney at samsung.com
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > From: iotivity-dev-bounces at lists.iotivity.org
> > >> > > > > [mailto:iotivity-dev-bounces at lists.iotivity.org] On Behalf
> > >> > > > > Of ?? ?(June Yong Young)
> > >> > > > > Sent: Wednesday, July 29, 2015 4:50 PM
> > >> > > > > To: 'Agrawal, Sachin'; '???'; Jawid Mirani_Intel; ?????;
> > >> > > ??
> > >> > > > ???_SE
> > >> > > > > Cc: iotivity-dev at lists.iotivity.org
> > >> > > > > Subject: Re: [dev] About preparing 0.9.2 Security Release
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Hi Sachin,
> > >> > > > >
> > >> > > > > Thank you for the tagging 0.9.2-RC2.
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Hi Pat, George, Jawid,
> > >> > > > >
> > >> > > > > I think still there is no more schedule delay required
> > >> > > > > although
> > >> > > RC2
> > >> > > > > has been 1 day delayed.
> > >> > > > >
> > >> > > > > However I am not sure what is Intel QA?s position about
> > >> > > > > 7/31 QA
> > >> > > 2nd
> > >> > > > > round completion date although Samsung QA is positive.
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > 0.9.2 : ?Spec vA Compliant + Spec vB Partial?
> > >> > > > >
> > >> > > > > ? Type for Release : Minor release, Schedule Driven,
> > >> > > > > PlugFest
> > >> > > > > #3
> > >> > > > >
> > >> > > > > ? Schedule (5 weeks ahead of QA completion) (cf. Original
> > >> > > > > QA
> > >> > > request
> > >> > > > > is 6 weeks ahead of QA start)
> > >> > > > >
> > >> > > > > ? 6/22, API freeze & Programmer?s guide freeze
> > >> > > > >
> > >> > > > > ? 7/20, Feature complete & Review Complete and make ?0.9.2-
> > RC1?
> > >> > > > > release to QA
> > >> > > > >
> > >> > > > > ? 7/24, QA 1st round complete
> > >> > > > >
> > >> > > > > ? 7/27->7/28, 0.9.2-RC2 release to QA
> > >> > > > >
> > >> > > > > ? 7/31, QA 2nd round complete
> > >> > > > >
> > >> > > > > ? 8/03, Website Open (if no issue)
> > >> > > > >
> > >> > > > > ? 8/17 week, Plug Fest #3
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > June Yong Young
> > >> > > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > >> > > > >
> > >> > > > > IoTivity Release Function Lead
> > >> > > > >
> > >> > > > >
> > >> > > > > Samsung Electronics Co.,Ltd.
> > >> > > > >
> > >> > > > > Software R&D Center, IoT Solution Lab. | Web & Convergence
> > >> > > > > Team
> > >> > > > >
> > >> > > > > Principal Engineer
> > >> > > > >
> > >> > > > > T: +82-31-301-6107, M: +82-10-9530-6107
> > >> > > > >
> > >> > > > > E-mail :juney at samsung.com
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > From: Agrawal, Sachin [mailto:sachin.agrawal at intel.com]
> > >> > > > > Sent: Wednesday, July 29, 2015 3:24 AM
> > >> > > > > To: juney at samsung.com; ???
> > >> > > > > Cc: iotivity-dev at lists.iotivity.org
> > >> > > > > Subject: RE: Re: [dev] About preparing 0.9.2 Security
> > >> > > > > Release
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Hi All,
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > I created the ?0.9.2-RC2? tag and pushed it to Iotivity repo.
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Thanks
> > >> > > > >
> > >> > > > > Sachin
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > From: Agrawal, Sachin
> > >> > > > > Sent: Tuesday, July 28, 2015 9:36 AM
> > >> > > > > To: 'juney at samsung.com'; ???
> > >> > > > > Cc: iotivity-dev at lists.iotivity.org
> > >> > > > > Subject: RE: Re: [dev] About preparing 0.9.2 Security
> > >> > > > > Release
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Since all the existing tags have upper-case letters ?RC?, I
> > >>assume
> > >> > > > > June meant to tag it with ?0.9.2-RC2?.
> > >> > > > >
> > >> > > > > Am I right?
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Thanks
> > >> > > > >
> > >> > > > > Sachin
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > From: ??? [mailto:juney at samsung.com]
> > >> > > > > Sent: Tuesday, July 28, 2015 8:01 AM
> > >> > > > > To: ???; Agrawal, Sachin; ???
> > >> > > > > Cc: iotivity-dev at lists.iotivity.org
> > >> > > > > Subject: Re: Re: [dev] About preparing 0.9.2 Security
> > >> > > > > Release
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Hi Sachin
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > What is the progress?
> > >> > > > >
> > >> > > > >
> > >> > > > > As soon as the review is completed, please tag "0.9.2-rc2".
> > >> > > > >
> > >> > > > > Sent from Mobiledesk
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > ---?? ???---
> > >> > > > > ??? : ???(June Yong Young)
> > >> > > > > ???? : 2015/07/28 15:31 (GMT+09:00) ?? : Re: [dev] About
> > >> > preparing
> > >> > > > > 0.9.2 Security Release
> > >> > > > >
> > >> > > > > Hi Sachi,
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > When will the review be finished? Everybody is waiting for
> > >> > > > > the completion by today.
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Regards
> > >> > > > >
> > >> > > > > June
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > June Yong Young
> > >> > > > > OIC Open Sourece WG Project Planning & Requirement TG Chair
> > >> > > > >
> > >> > > > > IoTivity Release Function Lead
> > >> > > > >
> > >> > > > >
> > >> > > > > Samsung Electronics Co.,Ltd.
> > >> > > > >
> > >> > > > > Software R&D Center, IoT Solution Lab. | Web & Convergence
> > >> > > > > Team
> > >> > > > >
> > >> > > > > Principal Engineer
> > >> > > > >
> > >> > > > > T: +82-31-301-6107, M: +82-10-9530-6107
> > >> > > > >
> > >> > > > > E-mail :juney at samsung.com
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > From: Agrawal, Sachin [mailto:sachin.agrawal at intel.com]
> > >> > > > > Sent: Tuesday, July 28, 2015 2:52 AM
> > >> > > > > To: juney at samsung.com; ???
> > >> > > > > Cc: iotivity-dev at lists.iotivity.org
> > >> > > > > Subject: RE: About preparing 0.9.2 Security Release
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Hi June,
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > SRM/Provisioning Mgr API is unable to discover the secure
> > >> > > > > port
> > >>of
> > >> > > the
> > >> > > > > new device.
> > >> > > > >
> > >> > > > > Jira ticket: https://jira.iotivity.org/browse/IOT-626
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > It is SpecA mandatory as Provisioning Tool is dependent on this.
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Code change is currently under review and will be pushed in
> > >> > > 0.9.2-dev
> > >> > > > > as soon as it finishes review process.
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Thanks
> > >> > > > >
> > >> > > > > Sachin
> > >> > > > >
> > >> > > > >
> > >> > > > > From: ??? [mailto:juney at samsung.com]
> > >> > > > > Sent: Monday, July 27, 2015 9:12 AM
> > >> > > > > To: ???; Agrawal, Sachin; iotivity-dev at lists.iotivity.org
> > >> > > > > Cc: Kesavan, Vijay S; Heldt-Sheller, Nathan; ???; ???; ??
> > >> > > ?; ???;
> > >> > > > ???;
> > >> > > > > ???; ???; ??
> > >> > > > > Subject: Re: About preparing 0.9.2 Security Release
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Hi Sachin, WooCheol,
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Please share the security issues in iotivity mailing list.
> > >> > > > >
> > >> > > > >
> > >> > > > > - what is the security issue?
> > >> > > > >
> > >> > > > >
> > >> > > > > - SpecA mandatory related issue? Or not?
> > >> > > > >
> > >> > > > >
> > >> > > > > - When will it be fixed?
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Regards
> > >> > > > >
> > >> > > > >
> > >> > > > > June
> > >> > > > >
> > >> > > > >
> > >> > > > > Sent from Mobiledesk
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > ---?? ???---
> > >> > > > > ??? : ???
> > >> > > > > ???? : 2015/07/27 16:58 (GMT+09:00) ?? : About preparing
> > >> > > > > 0.9.2 Security Release
> > >> > > > >
> > >> > > > > Hi Sachin,
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > June (release manager) asked me when the gerrit review
> > >> > > > > #1680
> > >>will
> > >> > > be
> > >> > > > > cherry-picked to 0.9.2-dev for testing and RC2.
> > >> > > > >
> > >> > > > > We confirmed that provisioning tool is working with
> > >> > > > > https://gerrit.iotivity.org/gerrit/#/c/1680 but, without
> > >> > > > > 1680,
> > >>we
> > >> > > > > failed to run it.
> > >> > > > >
> > >> > > > > If possible, could you please share the plan about this change?
> > >> > > > >
> > >> > > > > Thank you.
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > BR, Woochul
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > Choi, Soon Hwang
> > >> > > > >
> > >> > > > >
> > >> > > > > Senior Engineer / Ph. D.
> > >> > > > >
> > >> > > > > Software Engineering Team (SE Team) Software R&D Center
> > >> > > > >
> > >> > > > > SAMSUNG ELECTRONICS CO.,LTD
> > >> > > > >
> > >> > > > > AnyCall +82-10-7311-0206
> > >> > > > > e-mail soonhwang.choi at samsung.com
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > >
> > >> > > > > _______________________________________________
> > >> > > > > iotivity-dev mailing list
> > >> > > > > iotivity-dev at lists.iotivity.org
> > >> > > > > https://lists.iotivity.org/mailman/listinfo/iotivity-dev
> > >> > > >
> > >> > > >
> > >> > > > _______________________________________________
> > >> > > > iotivity-dev mailing list
> > >> > > > iotivity-dev at lists.iotivity.org
> > >> > > > https://lists.iotivity.org/mailman/listinfo/iotivity-dev
> > >> > >
> > >> > >
> > >> > >
> > >> > >
> > >> > >
> > >> > >
> > >> > >
> > >> > >
> > >>
> > >
> > >
> >
> 
> _______________________________________________
> iotivity-dev mailing list
> iotivity-dev at lists.iotivity.org
> https://lists.iotivity.org/mailman/listinfo/iotivity-dev

Reply via email to