At 16:10 11/08/2007, you wrote:

>On my ground rod I dug a hole 5 feet deep with a shovel and a 5 foot 
>steel bar and used a shop-vac to get the dirt out of the hole when 
>the shovel would not work any more.  I than used a large hammer to 
>pound the copper pipe in the last 5 feet but had to stop at 4 feet 
>as I hit a rock.  I than put in 30 lbs of salt with lots of water 
>over the next 2 days.  Than I used 30 lbs of Bentonite to fill the hole.
>

With those skills and dedication, Bill, we'll have to get you out to 
Grayland someday.....only problem is even when we put a good ground 
rod in, nature builds a dune on top of it before the next expedition.

best wishes,

Nick




****************************************************************************
Nick Hall-Patch
Victoria, B.C.
Canada

**************************************************************************** 

_______________________________________________
IRCA mailing list
[email protected]
http://montreal.kotalampi.com/mailman/listinfo/irca

Opinions expressed in messages on this mailing list are those of the original 
contributors and do not necessarily reflect the opinion of the IRCA, its 
editors, publishing staff, or officers

For more information: http://www.ircaonline.org

To Post a message: [email protected]

Reply via email to