> - This means that we're getting close to be able to run concurrent > jobs. Currently, some pushes don't get built: when a job is already > running and more than one push happens in the meantime (only the last > push is built). Soon, all pushes will get built. I will enable this for > the AFP repository at some point and will monitor how much this > increases overall load.
"testboard" and "afp_testboard" jobs can now run concurrently – these two jobs are much more important in that regard. That means that every single* push should get picked up for building. I will monitor the Jenkins load to see if we can enable this for "isabelle-repo" and "afp-repo". Note that worker allocation is "first come first serve". We currently have bandwidth for two AFP and two distribution builds at the same time, each taking approx. 80-90 minutes; everything else gets queued. Please push responsibly. More tweaks: - Build timing statistics are automatically published here: <https://ci.isabelle.systems/statistics/> - The status page has been tweaked per suggestion of Ondřej: just one button which leads to an overview including console output and list of changes. - Console output now always shows full output. No additional clicks needed for AFP build log. Cheers Lars * unless two pushes happen within three minutes, then the first one gets ignored _______________________________________________ isabelle-dev mailing list isabelle-...@in.tum.de https://mailmanbroy.informatik.tu-muenchen.de/mailman/listinfo/isabelle-dev