[
https://issues.apache.org/jira/browse/IMPALA-7101?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Dan Hecht reassigned IMPALA-7101:
---------------------------------
Assignee: Dan Hecht (was: Tim Armstrong)
> Builds are timing out/hanging
> -----------------------------
>
> Key: IMPALA-7101
> URL: https://issues.apache.org/jira/browse/IMPALA-7101
> Project: IMPALA
> Issue Type: Bug
> Reporter: Thomas Tauber-Marshall
> Assignee: Dan Hecht
> Priority: Blocker
> Labels: broken-build
>
> We've seen a large number of builds in the last week or two that appear to
> have hung and gotten killed after a 24-hour timeout.
> Exactly where the hang is occurring is different in each build, but II
> suspect it has something to do with cancellation no working correctly.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]