[
https://issues.apache.org/jira/browse/IMPALA-8247?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Work on IMPALA-8247 started by Joe McDonnell.
---------------------------------------------
> Backend tests from bit-stream-utils-test.cc and system-state-info-test.cc are
> not running
> -----------------------------------------------------------------------------------------
>
> Key: IMPALA-8247
> URL: https://issues.apache.org/jira/browse/IMPALA-8247
> Project: IMPALA
> Issue Type: Bug
> Components: Backend, Infrastructure
> Affects Versions: Impala 3.2.0
> Reporter: Joe McDonnell
> Assignee: Joe McDonnell
> Priority: Blocker
> Labels: broken-build
>
> Several tests in be/src/util were converted to the unified backend test
> executable in IMPALA-8071. Unfortunately, some tests stopped running as part
> of this change. Specifically, the tests in bit-stream-utils-test.cc and
> system-state-info-test.cc were not included in the test binary and stopped
> running. The tests changed to use ADD_UNIFIED_BE_LSAN_TEST, but the files
> were not included in the UtilTests library.
> These two files should be included in the test executable and we need to
> update the validation of the unified test executable
> (bin/validate-unified-backend-test-filters.py) to catch this case.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]