Laszlo Gaal created IMPALA-8555:
-----------------------------------
Summary: Spill tests run very slowly on CentOS 6
Key: IMPALA-8555
URL: https://issues.apache.org/jira/browse/IMPALA-8555
Project: IMPALA
Issue Type: Bug
Affects Versions: Impala 3.3.0
Reporter: Laszlo Gaal
On some recent automated test runs on CentOS 6, exhaustive mode the spilling
tests in parallel E2E tests took about 2 hours to run. This was probably the
root caused that pushed the job over the self-installed 20-hour timeout (which
IMPALA-8554 complains about).
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]