[
https://issues.apache.org/jira/browse/IMPALA-11733?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17636014#comment-17636014
]
Michael Smith commented on IMPALA-11733:
----------------------------------------
[~joemcdonnell] thoughts?
> Add test strategy besides exhaustive for longer tests
> -----------------------------------------------------
>
> Key: IMPALA-11733
> URL: https://issues.apache.org/jira/browse/IMPALA-11733
> Project: IMPALA
> Issue Type: Improvement
> Reporter: Michael Smith
> Priority: Major
>
> Some tests are guarded behind {{exploration-strategy=exhaustive}} because the
> tests can take awhile to run. However we want to run multiple configurations
> - such as S3, Ozone, EC, data cache - that also need to run these tests.
> Enabling {{exhaustive}} on all of them also adds all permutations of test
> dimensions, which takes even longer and is not necessarily desirable.
> It'd help to have another control, or another exploration strategy, to cover
> core+. Or to maybe "smoke" (a reduced set of tests that we think provide the
> most value to run on each patch) vs "core" (which covers all tests, but not
> necessarily all permutations of test parameters).
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]