[
https://issues.apache.org/jira/browse/IMPALA-12567?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Riza Suminto resolved IMPALA-12567.
-----------------------------------
Fix Version/s: Impala 4.4.0
Resolution: Fixed
> Deflake test_75_percent_availability
> ------------------------------------
>
> Key: IMPALA-12567
> URL: https://issues.apache.org/jira/browse/IMPALA-12567
> Project: IMPALA
> Issue Type: Test
> Affects Versions: Impala 4.3.0
> Reporter: Riza Suminto
> Assignee: Riza Suminto
> Priority: Major
> Fix For: Impala 4.4.0
>
>
> test_75_percent_availability can fail in certain build/test setup for not
> starting the last impalad within 5s delay injection. This test can be
> simplified to launch fewer impalad in total and the delay injection should be
> increased to not miss the window.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]