[ 
https://issues.apache.org/jira/browse/IMPALA-12567?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Riza Suminto resolved IMPALA-12567.
-----------------------------------
    Fix Version/s: Impala 4.4.0
       Resolution: Fixed

> Deflake test_75_percent_availability
> ------------------------------------
>
>                 Key: IMPALA-12567
>                 URL: https://issues.apache.org/jira/browse/IMPALA-12567
>             Project: IMPALA
>          Issue Type: Test
>    Affects Versions: Impala 4.3.0
>            Reporter: Riza Suminto
>            Assignee: Riza Suminto
>            Priority: Major
>             Fix For: Impala 4.4.0
>
>
> test_75_percent_availability can fail in certain build/test setup for not 
> starting the last impalad within 5s delay injection. This test can be 
> simplified to launch fewer impalad in total and the delay injection should be 
> increased to not miss the window.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to