[
https://issues.apache.org/jira/browse/IMPALA-12567?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17788047#comment-17788047
]
ASF subversion and git services commented on IMPALA-12567:
----------------------------------------------------------
Commit 04f31aea712d605893066f657ec1eb1bb746aeb1 in impala's branch
refs/heads/master from Riza Suminto
[ https://gitbox.apache.org/repos/asf?p=impala.git;h=04f31aea7 ]
IMPALA-12567: Deflake test_75_percent_availability
TestExecutorGroups.test_75_percent_availability can fail in certains
build/test setup for not starting the last impalad within 5s delay
injection. This patch simplifies the test by launching fewer impalad in
totals (reduced from 8 to 5, excluding coordinator) and increases the
delay injection to ensure test query run at all five executors. The test
renamed to test_partial_availability accordingly.
Testing:
- Run and pass the test against HDFS and S3.
Change-Id: I2e70f1dde10045c32c2bb4f6f78e8a707c9cd97d
Reviewed-on: http://gerrit.cloudera.org:8080/20712
Reviewed-by: Impala Public Jenkins <[email protected]>
Tested-by: Impala Public Jenkins <[email protected]>
> Deflake test_75_percent_availability
> ------------------------------------
>
> Key: IMPALA-12567
> URL: https://issues.apache.org/jira/browse/IMPALA-12567
> Project: IMPALA
> Issue Type: Test
> Affects Versions: Impala 4.3.0
> Reporter: Riza Suminto
> Assignee: Riza Suminto
> Priority: Major
> Fix For: Impala 4.4.0
>
>
> test_75_percent_availability can fail in certain build/test setup for not
> starting the last impalad within 5s delay injection. This test can be
> simplified to launch fewer impalad in total and the delay injection should be
> increased to not miss the window.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]