[ 
https://issues.apache.org/jira/browse/IMPALA-15153?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=18095056#comment-18095056
 ] 

ASF subversion and git services commented on IMPALA-15153:
----------------------------------------------------------

Commit 8eee3357cf0c766c396894ea486f4b88579266f4 in impala's branch 
refs/heads/master from Csaba Ringhofer
[ https://gitbox.apache.org/repos/asf?p=impala.git;h=8eee3357c ]

IMPALA-15153: Reorganize geospatial test files

Move some tests out of geospatial-esri.test and
geospatial-esri-extra.test:
- geospatial-esri-srid.test: SRID-dependent tests
- geospatial-esri-specific-overloads.test: overloads planned to be
  dropped later
- geospatial-esri-high-dimension.test: 3D/4D geometry tests

Pure test reorganization with no behavior change - every query block is
preserved verbatim.
The grouping prepares tests for later geospatial_library
specific selection.

Change-Id: Id9952a3979d3260ca7c19231e30fd4b0c36c3266
Assisted-by: Claude Opus 4.8
Reviewed-on: http://gerrit.cloudera.org:8080/24548
Reviewed-by: Impala Public Jenkins <[email protected]>
Tested-by: Impala Public Jenkins <[email protected]>


> GEOMETRY preparation: reorganize geospatial tests
> -------------------------------------------------
>
>                 Key: IMPALA-15153
>                 URL: https://issues.apache.org/jira/browse/IMPALA-15153
>             Project: IMPALA
>          Issue Type: Sub-task
>            Reporter: Csaba Ringhofer
>            Assignee: Csaba Ringhofer
>            Priority: Major
>




--
This message was sent by Atlassian Jira
(v8.20.10#820010)

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to