Daynews created AMQ-7340:
----------------------------

             Summary: Scheduled messages performance degrade
                 Key: AMQ-7340
                 URL: https://issues.apache.org/jira/browse/AMQ-7340
             Project: ActiveMQ
          Issue Type: Bug
         Environment: ActiveMQ broker has been started in a docker container, 
with (most likely) sufficient allocation of resources.
            Reporter: Daynews


I have sent lot of scheduled messages with 10ms delay between each to see if 
the broker can cope with high load of scheduled messages. Sending delayed 
messages to the queue works fine, however I get a problem when those messages 
need to be put to the main queue when next schedule time is reached. The rate 
of putting scheduled messages to the main queue drops drastically at around 
1500-3000 messages. I tried to search for a potential cause why this happen, 
but was not able to indicate anything. Even restarting the broker or cleaning 
the main queue, the rate of putting scheduled messages stays at ~0.5s leaving 
many scheduled messages behind. 

Does anyone know a potential cause for his problem? Is this performance 
bottleneck or insufficient resources or badly configured RabitMQ (I've used 
default settings).

Thanks for the support.

 



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to