[
https://issues.apache.org/jira/browse/AIRAVATA-1436?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Suresh Marru updated AIRAVATA-1436:
-----------------------------------
Labels: gsoc2022 gsoc2023 (was: gsoc2022)
> Provide meta scheduling capabilities within Airavata
> ----------------------------------------------------
>
> Key: AIRAVATA-1436
> URL: https://issues.apache.org/jira/browse/AIRAVATA-1436
> Project: Airavata
> Issue Type: Epic
> Components: Airavata Orchestrator, GFac
> Reporter: Suresh Marru
> Priority: Major
> Labels: gsoc2022, gsoc2023
> Fix For: WISHLIST
>
>
> As discussed on the architecture mailing list [1] and summarized at [2],
> Airavata will need to develop a metascheduler. In the short term, a user
> request (demeler, gobert) is to have airavata throttle jobs to resources. In
> the future more informed scheduling strategies needs to be integrated.
> Hopefully, the actual scheduling algorithms can be borrowed from third party
> implementations.
> [1] - http://markmail.org/message/tdae5y3togyq4duv
> [2] -
> https://cwiki.apache.org/confluence/display/AIRAVATA/Airavata+Metascheduler
--
This message was sent by Atlassian Jira
(v8.20.10#820010)