[
https://issues.apache.org/jira/browse/AMBARI-15638?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Aravindan Vijayan reopened AMBARI-15638:
----------------------------------------
> [AMS] Sum Calculation Incorrect
> -------------------------------
>
> Key: AMBARI-15638
> URL: https://issues.apache.org/jira/browse/AMBARI-15638
> Project: Ambari
> Issue Type: Bug
> Reporter: Aravindan Vijayan
> Assignee: Aravindan Vijayan
> Priority: Blocker
> Attachments: AMBARI-15638.patch
>
>
> Sum Calculation is incorrect when the time range is more than 2 hrs.
> This issue affects all metrics that are queried with the "sum" aggregator
> (with or without hostname being specified) for more than a 2hr time-range.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)