[
https://issues.apache.org/jira/browse/AMBARI-12697?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Di Li updated AMBARI-12697:
---------------------------
Description:
Ambari UI shows operation history in the ops prompt. All upgrade and downgrade
attempts are not shown on the UI once user finalizes it and close the
upgrade/downgrade UI.
The information is in the database already. This JIRA is to propose a way to
add UI elements to display a list of upgrades/downgrades associated with the
cluster.
was:
Currently, the rolling upgrade step by step results are lost once user finishes
the finalize and reload the UI. It would be helpful if the Ambari web UI offers
exporting the step by step rolling upgrade result (as in what component
failed/succeeded restart/service check, corresponding command/output/err file)
into a text file (XML or JSON) so user can download it as a record of what
happened during the rolling upgrade.
This information should also be preserved in the Ambari database.
Summary: Rolling upgrade: Ambari UI should be able to export the step
by step rolling upgrade result (was: Rolling upgrade: Ambari UI should be able
to export the step by step rolling upgrade result into a text file)
> Rolling upgrade: Ambari UI should be able to export the step by step rolling
> upgrade result
> -------------------------------------------------------------------------------------------
>
> Key: AMBARI-12697
> URL: https://issues.apache.org/jira/browse/AMBARI-12697
> Project: Ambari
> Issue Type: Improvement
> Components: ambari-server, ambari-web
> Affects Versions: 2.1.0
> Reporter: Di Li
>
> Ambari UI shows operation history in the ops prompt. All upgrade and
> downgrade attempts are not shown on the UI once user finalizes it and close
> the upgrade/downgrade UI.
> The information is in the database already. This JIRA is to propose a way to
> add UI elements to display a list of upgrades/downgrades associated with the
> cluster.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)