[ 
https://issues.apache.org/jira/browse/AMBARI-18027?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Jaimin D Jetly updated AMBARI-18027:
------------------------------------
    Description: 
I tried enabling HiveServer Interactive by doing the following steps
*STR:*
Iteration 1
1) Adjusted slider for "% Cluster Capacity" to 83%
2) Adjusted slider for "Maximum Concurrent Queries" to 4
3) Based on some computation "Number of LLAP Daemons" is chosen as 7

Iteration 2
4) Moved "% Cluster Capacity" to 90%
5) Moved "Maximum Concurrent Queries" to 4
6) "Number of LLAP Daemons" is now chosen 6

*Actual Result:* The combination of configs set with new values after iteration 
2 seems to be incorrect


> Hive HSI number of daemons label does not refresh
> -------------------------------------------------
>
>                 Key: AMBARI-18027
>                 URL: https://issues.apache.org/jira/browse/AMBARI-18027
>             Project: Ambari
>          Issue Type: Bug
>          Components: ambari-web
>    Affects Versions: 2.4.0
>            Reporter: Jaimin D Jetly
>            Assignee: Jaimin D Jetly
>            Priority: Critical
>             Fix For: 2.4.0
>
>         Attachments: AMBARI-18027.patch
>
>
> I tried enabling HiveServer Interactive by doing the following steps
> *STR:*
> Iteration 1
> 1) Adjusted slider for "% Cluster Capacity" to 83%
> 2) Adjusted slider for "Maximum Concurrent Queries" to 4
> 3) Based on some computation "Number of LLAP Daemons" is chosen as 7
> Iteration 2
> 4) Moved "% Cluster Capacity" to 90%
> 5) Moved "Maximum Concurrent Queries" to 4
> 6) "Number of LLAP Daemons" is now chosen 6
> *Actual Result:* The combination of configs set with new values after 
> iteration 2 seems to be incorrect



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to