[
https://issues.apache.org/jira/browse/AMBARI-20759?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15977030#comment-15977030
]
Hudson commented on AMBARI-20759:
---------------------------------
SUCCESS: Integrated in Jenkins build Ambari-branch-2.5 #1419 (See
[https://builds.apache.org/job/Ambari-branch-2.5/1419/])
AMBARI-20759. The Web Client Upgrade Wizard Does Not Wait Long Enough (hiveww:
[http://git-wip-us.apache.org/repos/asf?p=ambari.git&a=commit&h=beee84c9ab575a56f90a0a0cf23d447b093d3913])
* (edit) ambari-web/app/utils/ajax/ajax.js
> The Web Client Upgrade Wizard Does Not Wait Long Enough When Creating a Large
> Upgrade
> -------------------------------------------------------------------------------------
>
> Key: AMBARI-20759
> URL: https://issues.apache.org/jira/browse/AMBARI-20759
> Project: Ambari
> Issue Type: Bug
> Components: ambari-web
> Affects Versions: 2.4.2
> Reporter: Antonenko Alexander
> Assignee: Antonenko Alexander
> Fix For: 2.5.1
>
> Attachments: AMBARI-20759.patch
>
>
> When creating an upgrade on a large cluster, the backend currently takes a
> very long time to create the data and persist it. Although steps are being
> taken to greatly reduce this time, it could still take up to several minutes
> for this request to go through.
> The web client currently doesn't wait long enough for the upgrade to being.
> It will produce an error message saying that the upgrade could not be created
> and then gets confused when the upgrade eventually shows up. It also allows a
> user to try to create another upgrade while the first is still being
> generated.
> STR:
> - Create a rolling upgrade on a cluster with 1000 hosts where every host has
> 15 components installed.
--
This message was sent by Atlassian JIRA
(v6.3.15#6346)