[ 
https://issues.apache.org/jira/browse/AMBARI-20759?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15977030#comment-15977030
 ] 

Hudson commented on AMBARI-20759:
---------------------------------

SUCCESS: Integrated in Jenkins build Ambari-branch-2.5 #1419 (See 
[https://builds.apache.org/job/Ambari-branch-2.5/1419/])
AMBARI-20759. The Web Client Upgrade Wizard Does Not Wait Long Enough (hiveww: 
[http://git-wip-us.apache.org/repos/asf?p=ambari.git&a=commit&h=beee84c9ab575a56f90a0a0cf23d447b093d3913])
* (edit) ambari-web/app/utils/ajax/ajax.js


> The Web Client Upgrade Wizard Does Not Wait Long Enough When Creating a Large 
> Upgrade
> -------------------------------------------------------------------------------------
>
>                 Key: AMBARI-20759
>                 URL: https://issues.apache.org/jira/browse/AMBARI-20759
>             Project: Ambari
>          Issue Type: Bug
>          Components: ambari-web
>    Affects Versions: 2.4.2
>            Reporter: Antonenko Alexander
>            Assignee: Antonenko Alexander
>             Fix For: 2.5.1
>
>         Attachments: AMBARI-20759.patch
>
>
> When creating an upgrade on a large cluster, the backend currently takes a 
> very long time to create the data and persist it. Although steps are being 
> taken to greatly reduce this time, it could still take up to several minutes 
> for this request to go through.
> The web client currently doesn't wait long enough for the upgrade to being. 
> It will produce an error message saying that the upgrade could not be created 
> and then gets confused when the upgrade eventually shows up. It also allows a 
> user to try to create another upgrade while the first is still being 
> generated.
> STR:
> - Create a rolling upgrade on a cluster with 1000 hosts where every host has 
> 15 components installed.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

Reply via email to