Jonathan Hurley created AMBARI-21866:
----------------------------------------
Summary: ATS Applications Do Not Move From Active to Done After
Upgrade
Key: AMBARI-21866
URL: https://issues.apache.org/jira/browse/AMBARI-21866
Project: Ambari
Issue Type: Bug
Affects Versions: 2.6.0
Reporter: Jonathan Hurley
Assignee: Jonathan Hurley
Fix For: 2.6.0
When running Tez jobs, it was noticed that after killing the applications, ATS
would never move them from the active directory to the done directory. The YARN
folks deep some technical investigation and determined that the reason for this
was a combination of ATS 1.0 and 1.5 configurations co-existing after upgrading
from BigInsights to HDP.
The upgrade auto-merge should have taken care of this for us, but it seems that
1 property was missing from the default stack BI 4.2 (even though it gets added
on install through the UI).
{code}
grep -r --include "*.xml" "yarn.timeline-service.store-class"
src/main/resources/stacks/BigInsights
src/main/resources/stacks/BigInsights/4.0/services/YARN/configuration/yarn-site.xml:
<name>yarn.timeline-service.store-class</name>
src/main/resources/stacks/BigInsights/4.2.5/services/YARN/configuration/yarn-site.xml:
<name>yarn.timeline-service.store-class</name>
{code}
BI 4.2.0 doesn't have this property, which causes the merge to fail. It doesn't
inherit it from BI 4.0 either.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)