Jonathan Hurley created AMBARI-21866:
----------------------------------------

             Summary: ATS Applications Do Not Move From Active to Done After 
Upgrade
                 Key: AMBARI-21866
                 URL: https://issues.apache.org/jira/browse/AMBARI-21866
             Project: Ambari
          Issue Type: Bug
    Affects Versions: 2.6.0
            Reporter: Jonathan Hurley
            Assignee: Jonathan Hurley
             Fix For: 2.6.0


When running Tez jobs, it was noticed that after killing the applications, ATS 
would never move them from the active directory to the done directory. The YARN 
folks deep some technical investigation and determined that the reason for this 
was a combination of ATS 1.0 and 1.5 configurations co-existing after upgrading 
from BigInsights to HDP.

The upgrade auto-merge should have taken care of this for us, but it seems that 
1 property was missing from the default stack BI 4.2 (even though it gets added 
on install through the UI).

{code}
grep -r --include "*.xml" "yarn.timeline-service.store-class" 
src/main/resources/stacks/BigInsights
src/main/resources/stacks/BigInsights/4.0/services/YARN/configuration/yarn-site.xml:
    <name>yarn.timeline-service.store-class</name>
src/main/resources/stacks/BigInsights/4.2.5/services/YARN/configuration/yarn-site.xml:
    <name>yarn.timeline-service.store-class</name>
{code}

BI 4.2.0 doesn't have this property, which causes the merge to fail. It doesn't 
inherit it from BI 4.0 either.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to