[ https://issues.apache.org/jira/browse/AMBARI-23127?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Siddharth Wagle resolved AMBARI-23127. -------------------------------------- Resolution: Fixed > Allow default value of number of parallel tasks run during Upgrade to be > customizable > ------------------------------------------------------------------------------------- > > Key: AMBARI-23127 > URL: https://issues.apache.org/jira/browse/AMBARI-23127 > Project: Ambari > Issue Type: Bug > Components: ambari-server > Affects Versions: 2.0.0 > Reporter: Siddharth Wagle > Assignee: Siddharth Wagle > Priority: Critical > Labels: pull-request-available > Fix For: 2.6.2 > > Time Spent: 1h 10m > Remaining Estimate: 0h > > On large clusters of 1000+ nodes the default value of 100 for max degree of > parallelism results in Stop and Start command batches of 100 hosts and > resulting operation taking longer because of the default batch size. This > Jira adds a possible override through ambari.properties. > Property: > {noformat} > stack.upgrade.default.parallelism{noformat} -- This message was sent by Atlassian JIRA (v7.6.3#76005)