[
https://issues.apache.org/jira/browse/AMBARI-23340?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Zoltan Haindrich updated AMBARI-23340:
--------------------------------------
Attachment: step5_before.png
step5_after_refresh.png
> refreshing step#5 during installation looses services
> -----------------------------------------------------
>
> Key: AMBARI-23340
> URL: https://issues.apache.org/jira/browse/AMBARI-23340
> Project: Ambari
> Issue Type: Bug
> Reporter: Zoltan Haindrich
> Priority: Major
> Attachments: step4_selected.png, step5_after_refresh.png,
> step5_before.png
>
>
> * I've selected only Hive and required components
> * on the next page; "Assign Master" I see {{Activity Analyzer}},{{Timeline
> Reader}} and other things which became absent after a refreshing the page
> * IIRC when I've first seen this step today there was also a timeline 1.5
> server which is missing ever since...
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)