[ 
https://issues.apache.org/jira/browse/AMBARI-25443?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Dmytro Grinenko updated AMBARI-25443:
-------------------------------------
    Resolution: Fixed
        Status: Resolved  (was: Patch Available)

> Create principal/keytab operation with multi threaded
> -----------------------------------------------------
>
>                 Key: AMBARI-25443
>                 URL: https://issues.apache.org/jira/browse/AMBARI-25443
>             Project: Ambari
>          Issue Type: Improvement
>          Components: ambari-server
>    Affects Versions: 2.6.2
>            Reporter: Dmytro Grinenko
>            Assignee: Dmytro Grinenko
>            Priority: Critical
>              Labels: pull-request-available
>             Fix For: 2.6.2
>
>          Time Spent: 50m
>  Remaining Estimate: 0h
>
> Ambari Principal and keytabs create operation runs in sequential manner, 
> which taking a lot of time on a large cluster.
> To cut the time, each step should be palatalized between cluster nodes.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to