[
https://issues.apache.org/jira/browse/AMBARI-25589?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Andrew Onischuk updated AMBARI-25589:
-------------------------------------
Description: When transition between IN_PROGRESS and COMPLETED happens in
agent while server is connected, but in not responsive state. The report may
get lost and never be sent to server. Resulting in server waiting for a long
time for this report and eventually killing the command stage by timeout.
(was: When transition between IN_PROGRESS and COMPLETED happens in agent while
server is connected, but in not responsive state. The report may get lost.)
> When hearbeat is lost sometimes start/stop tasks can hang for a long time.
> --------------------------------------------------------------------------
>
> Key: AMBARI-25589
> URL: https://issues.apache.org/jira/browse/AMBARI-25589
> Project: Ambari
> Issue Type: Bug
> Reporter: Andrew Onischuk
> Assignee: Andrew Onischuk
> Priority: Major
> Fix For: 2.7.6
>
> Attachments: AMBARI-25589.patch
>
> Time Spent: 20m
> Remaining Estimate: 0h
>
> When transition between IN_PROGRESS and COMPLETED happens in agent while
> server is connected, but in not responsive state. The report may get lost and
> never be sent to server. Resulting in server waiting for a long time for this
> report and eventually killing the command stage by timeout.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)