[ 
https://issues.apache.org/jira/browse/AURORA-1528?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14994736#comment-14994736
 ] 

Maxim Khutornenko edited comment on AURORA-1528 at 11/6/15 11:59 PM:
---------------------------------------------------------------------

I agree with Bill here. The convenience this feature may bring us isn't worth 
the added complexity. Sorry, but I am going to close it as Won't Fix unless you 
have other strong arguments we have not heard yet.


was (Author: maximk):
I agree with Bill here. The convenience this feature may bring us isn't worth 
the added complexity. Sorry, but I am going to close it as Won't Fix unless you 
have other strong arguments we have heard yet.

> New snooze feature for cron jobs
> --------------------------------
>
>                 Key: AURORA-1528
>                 URL: https://issues.apache.org/jira/browse/AURORA-1528
>             Project: Aurora
>          Issue Type: Story
>          Components: Scheduler
>            Reporter: Thomas Sun
>            Assignee: Thomas Sun
>            Priority: Minor
>
> something that would fulfill my need would be in the next 
> d:h:m:s(days:hours:minutes:seconds) from NOW, 
> do not run(or skip running) the job even though it may be scheduled to run 
> for x times within that time range.
> if a job is scheduled to run at T0, T6, T12, T18 UTC everyday, and I did a 
> snooze 0:8:0:0 for this job at UTC T16, then the next 2 runs(T18 today and T0 
> tomorrow) of the job should be skipped.
> another useful interface for me would be snooze x -> x is the number of runs 
> from NOW to skip.
> Design: 
> https://docs.google.com/document/d/1NEMb9Qbc9T9ZBlOifkRjB2OYGnO_pNURNQcsSLXArSk/edit



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to