Igor Morozov commented on AURORA-1749:
--------------------------------------

I meant we have a flag in Job Update's metadata that indicates that we're 
rolling back to a previous version. The Job Update will be rolling forward.

> Get a support for distributed job update coordination
> -----------------------------------------------------
>
>                 Key: AURORA-1749
>                 URL: https://issues.apache.org/jira/browse/AURORA-1749
>             Project: Aurora
>          Issue Type: Story
>          Components: Scheduler
>            Reporter: Igor Morozov
>            Assignee: Igor Morozov
>
> This is for a use case to update jobs that are the same but spread across 
> multiple datacenters and managed by different aurora clusters.
> For example we have a service job test-service that runs in two datacenters 
> dc1 and dc1.
> Logically the job needs to be updated in a single lock step across multiple 
> data centers and if any job update fails and goes into ROLLING_BACK state
> all the others need to start a rollback as well.
>  
> This is what we want to achieve with this change:
> 1. Coordinator starts an upgrade:
>     dc1: -> starting update1 for job1
>     dc2: -> staring update2 for job2
> 2. Coordinator:
>     dc1: update1 is done, enters paused state
>     dc2: update2 has failed, rolling back
> 3. Coordinator:
>     dc1: starts rolling back update 1
>     dc2: update 2 is rolled back
> 4. Coordinator:
>     dc1: update 1 is rolled back
>     dc2: update 2 is rolled back
> Currently step 2 is impossible in aurora as job update enters the terminal 
> state and could not be rolled back from it.
> There was some discussion in AURORA-1721 ticket regarding using another job 
> update to roll forward the job to a previous version effectively simulating a 
> rollback. But now in order to reconcile the state of an actual update 
> operation one would need to consider two or more update jobs and 
> differentiate between normal ROLLED_FORWARD vs ROLLED_FORWARD(rollback) jobs. 
> That feels quite artificial error prone. We believe an ability to run a 
> coordinate job update across multiple data centers should be a first class 
> citizen in aurora



--