Bill Farner created AURORA-718:
----------------------------------
Summary: JobUpdateConfiguration should reflect work required for a
job update
Key: AURORA-718
URL: https://issues.apache.org/jira/browse/AURORA-718
Project: Aurora
Issue Type: Story
Components: Scheduler
Reporter: Bill Farner
Assignee: Bill Farner
JobUpdateConfiguration contains three fields to reflect the 'before' and
'after' state of a job: instanceCount, newTaskConfig, oldTaskConfigs. These
could be leveraged to do the same, but also show the 'actual work' required for
the update. For example, in an update that is scoped to specific instances, or
where not all instances need to be modified (no-ops), these fields should
indicate which instances the scheduler needs to modify.
This ticket tracks a change to how oldTaskConfigs is computed. AURORA-717
tracks conversion of the other two fields.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)