[
https://issues.apache.org/jira/browse/BEAM-4559?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Mikhail Gryzykhin updated BEAM-4559:
------------------------------------
Description:
[https://docs.google.com/document/d/1sczGwnCvdHiboVajGVdnZL0rfnr7ViXXAebBAf_uQME/edit#heading=h.t71pj6h7rd0w]
Follow up on design doc specified above and implement required code work.
* Split existing post-commit tests jobs to automatically and manually
triggered [Done]
* Add tracking by JIRA bugs for failing test job [Done]
* Create document describing post-commit failures handling policies [Done]
* Add tests status badge to PR template [Done]
* Create dashboard for post-commit tests [Done]
* Detect and fix flaky java tests [Done]
was:
[https://docs.google.com/document/d/1sczGwnCvdHiboVajGVdnZL0rfnr7ViXXAebBAf_uQME/edit#heading=h.t71pj6h7rd0w]
Follow up on design doc specified above and implement required code work.
* Split existing post-commit tests jobs to automatically and manually
triggered [Done]
* Add tracking by JIRA bugs for failing test job
* Create document describing post-commit failures handling policies
* Add tests status badge to PR template [Done]
* Create dashboard for post-commit tests
* Detect and fix flaky java tests [Done]
> Post-Commit tests stability
> ---------------------------
>
> Key: BEAM-4559
> URL: https://issues.apache.org/jira/browse/BEAM-4559
> Project: Beam
> Issue Type: Improvement
> Components: testing
> Reporter: Mikhail Gryzykhin
> Assignee: Mikhail Gryzykhin
> Priority: Major
> Fix For: Not applicable
>
> Time Spent: 5h 40m
> Remaining Estimate: 0h
>
> [https://docs.google.com/document/d/1sczGwnCvdHiboVajGVdnZL0rfnr7ViXXAebBAf_uQME/edit#heading=h.t71pj6h7rd0w]
> Follow up on design doc specified above and implement required code work.
> * Split existing post-commit tests jobs to automatically and manually
> triggered [Done]
> * Add tracking by JIRA bugs for failing test job [Done]
> * Create document describing post-commit failures handling policies [Done]
> * Add tests status badge to PR template [Done]
> * Create dashboard for post-commit tests [Done]
> * Detect and fix flaky java tests [Done]
>
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)