[
https://issues.apache.org/jira/browse/BEAM-10385?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17160301#comment-17160301
]
Valentyn Tymofieiev commented on BEAM-10385:
--------------------------------------------
I went over CP requests for RC2 and took another look at #12133. Given that we
have a workaround (to start an extra expansion server), I think we should
proceed with releasing this as planned in 2.24.0. This change also affects the
builds for Direct runner and Job server so it has higher risk potential for
slowing the release train, although looks safe otherwise.
> Integrate SQL expansion into Flink job server
> ---------------------------------------------
>
> Key: BEAM-10385
> URL: https://issues.apache.org/jira/browse/BEAM-10385
> Project: Beam
> Issue Type: New Feature
> Components: runner-flink
> Reporter: Maximilian Michels
> Assignee: Maximilian Michels
> Priority: P2
> Fix For: 2.24.0
>
> Time Spent: 1h 40m
> Remaining Estimate: 0h
>
> The expansion server is started with the job server to allow for an expansion
> of external transforms during pipeline submission. At the moment, an extra
> expansion server has to be started to expand SqlTransform. It would be
> desirable to include the SQL expansion into the expansion server that is
> started with the job server.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)