[
https://issues.apache.org/jira/browse/BEAM-6445?focusedWorklogId=185542&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-185542
]
ASF GitHub Bot logged work on BEAM-6445:
----------------------------------------
Author: ASF GitHub Bot
Created on: 16/Jan/19 01:58
Start Date: 16/Jan/19 01:58
Worklog Time Spent: 10m
Work Description: rohdesamuel commented on pull request #7529:
[BEAM-6445]: Release Guide changes for release process improvement
URL: https://github.com/apache/beam/pull/7529
This change will hopefully increase the greenness of the build by:
increasing coverage, adding pre and post commits to release validation, and
adding a regular cadence to look at flaky and backlogged tests.
Dev list thread:
https://lists.apache.org/thread.html/d52ffbfca21eee953a230100520bd56d947a359c0029d5c291b736a7@%3Cdev.beam.apache.org%3E
------------------------
Follow this checklist to help us incorporate your contribution quickly and
easily:
- [x] Format the pull request title like `[BEAM-XXX] Fixes bug in
ApproximateQuantiles`, where you replace `BEAM-XXX` with the appropriate JIRA
issue, if applicable. This will automatically link the pull request to the
issue.
- [ ] If this contribution is large, please file an Apache [Individual
Contributor License Agreement](https://www.apache.org/licenses/icla.pdf).
It will help us expedite review of your Pull Request if you tag someone
(e.g. `@username`) to look at it.
Post-Commit Tests Status (on master branch)
------------------------------------------------------------------------------------------------
Lang | SDK | Apex | Dataflow | Flink | Gearpump | Samza | Spark
--- | --- | --- | --- | --- | --- | --- | ---
Go | [](https://builds.apache.org/job/beam_PostCommit_Go/lastCompletedBuild/)
| --- | --- | --- | --- | --- | ---
Java | [](https://builds.apache.org/job/beam_PostCommit_Java/lastCompletedBuild/)
| [](https://builds.apache.org/job/beam_PostCommit_Java_ValidatesRunner_Apex/lastCompletedBuild/)
| [](https://builds.apache.org/job/beam_PostCommit_Java_ValidatesRunner_Dataflow/lastCompletedBuild/)
| [](https://builds.apache.org/job/beam_PostCommit_Java_ValidatesRunner_Flink/lastCompletedBuild/)<br>[](https://builds.apache.org/job/beam_PostCommit_Java_PVR_Flink_Batch/lastCompletedBuild/)<br>[](https://builds.apache.org/job/beam_PostCommit_Java_PVR_Flink_Streaming/lastCompletedBuild/)
| [](https://builds.apache.org/job/beam_PostCommit_Java_ValidatesRunner_Gearpump/lastCompletedBuild/)
| [](https://builds.apache.org/job/beam_PostCommit_Java_ValidatesRunner_Samza/lastCompletedBuild/)
| [](https://builds.apache.org/job/beam_PostCommit_Java_ValidatesRunner_Spark/lastCompletedBuild/)
Python | [](https://builds.apache.org/job/beam_PostCommit_Python_Verify/lastCompletedBuild/)
| --- | [](https://builds.apache.org/job/beam_PostCommit_Py_VR_Dataflow/lastCompletedBuild/)
</br> [](https://builds.apache.org/job/beam_PostCommit_Py_ValCont/lastCompletedBuild/)
| [](https://builds.apache.org/job/beam_PostCommit_Python_VR_Flink/lastCompletedBuild/)
| --- | --- | ---
----------------------------------------------------------------
This is an automated message from the Apache Git Service.
To respond to the message, please log on GitHub and use the
URL above to go to the specific comment.
For queries about this service, please contact Infrastructure at:
[email protected]
Issue Time Tracking
-------------------
Worklog Id: (was: 185542)
Time Spent: 10m
Remaining Estimate: 0h
> Improve Release Process
> -----------------------
>
> Key: BEAM-6445
> URL: https://issues.apache.org/jira/browse/BEAM-6445
> Project: Beam
> Issue Type: Improvement
> Components: project-management
> Reporter: Sam Rohde
> Assignee: Sam Rohde
> Priority: Major
> Time Spent: 10m
> Remaining Estimate: 0h
>
> This JIRA tracks the improvement of the Beam release process as [discussed in
> the dev
> list|https://lists.apache.org/thread.html/d52ffbfca21eee953a230100520bd56d947a359c0029d5c291b736a7@%3Cdev.beam.apache.org%3E].
> In summary, this change will hopefully increase the greenness of the build
> by: increasing coverage, adding pre and post commits to release validation,
> and adding a regular cadence to look at flaky and backlogged tests.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)